|
|
| ... products without technical information |
| |
| ... products without technical information |
| |
| ... products without technical information |
| |
| ... products without technical information |
| |
| ... products without technical information |
| |
Stockyard Systems
Coaling installation
Germany
1x portal scraper KP1000.56
track 56.2 m
height of pile 21 m
hard coal 1000 t/h |
|
The Modular System for Engineering Structures
PERI engineers have created ideal project and connecting method combinations from known tunnel, bridge and construction engineering load combinations, and developed this to form a versatile construction kit. This means load-optimized and geometrically-adapted supporting formwork can be built from a large selection of system components.
VARIOKIT, the engineering construction kit with rentable, standardized components, is the solution for numerous requirements in civil engineering:
- fast
- safe
- cost-effective
In the process, PERI provides technical information for each project e.g. operating instructions and assembly drawings. Static calculations and assembly support are also integral elements such as the constant support given to contractors and help provided with new tasks for current projects. For all construction projects, PERI can provide everything from one source. |
|
Automated welding gantry
Reliable and productive mechanised welding workplaces fulfil custom requirements for up-to-date automation solutions and consider as well environmental requirements. |
|
Solartron Metrology produces a range of versatile electronic conditioning units for their range of LVDT and Half Bridge transducers.
Unit shown is the OD2
• True two wire transmitter
• 4 to 20mA output
• Power and signal on same wires
• Environmentally sealed (IP65)
• Ideal for remote measurements
• Wired in connectors
• Power Supply 13 to 48V dc, 30mA
|
|
|
|