Technology tie-up for reactors up to 110 MVAr, 765kV 1-phase reactors under collaboration with OJSC, Zaporz Transformator, Ukraine. Complete in-house testing facilities in India reveal up to 765 kV class. To enhance the establishment and effectiveness of energy transmission, shunt reactors are occupied in the system.Shunt reactors are comparable to a power transformer in winding design and establishment. For optimum dependability/cost efficiency and minimum life-cycle cost as well as in-rush currents, a simple and robust build-up is adopted. This is most cost adequate means to refund the capacitive generation in order to maintain establishment under severe cold, severe heat, lightning and earthquake, as well as violent fluctuations in voltage. We propose a wide range of products for single phase and three phase reactors considering transport limitations in some countries and also as per customer requirements.