BELL FURNACE SEMI/FULL AUTOMATIC OR MANUAL - SYSTEM 250/251
Modular bell-furnace with stations separated functionally and direct quenching transfer.
The quench transfer system for loading from the furnace to the tank is carried out by simply sliding the load without any hooking mechanism
Furnace-quench tank transfer time is less than 15 seconds
Integration of various quenching options enabling a greater variety of furnace/tank combinations
Easy extension of existing line with new requirements, both in terms of capacity and treatments
Particularly suitable for production of parts in medium and small production runs requiring flexibility of heat treatment parameters (temperature and atmosphere) and for thin + long parts which risk of distortion
Quench transfer under atmosphere without loss of temperature before quenching the load