Climbing formwork
K
DOKA
The formwork element, climbing scaffold, and platform are firmly connected to one another and are cycled in one piece in a single crane-lift. This reduces lifting times, so it also cuts down on crane time.
Rapid working
thanks to easy handling
Reduced labour and crane times, as
- climbing platform and formwork are cycled together in one piece
- formwork can be plumbed and aligned very quickly
- tiltable formwork element makes it easy to set up and strike the formwork
- pre-assembled, work-ready platform units
Lower manpower costs
thanks to fast working routines
This practical system
- saves time by combining several operations into one
- lowers labour costs as the formwork can be set up and struck with no need - avoids time-consuming interim storage
Rapid working
thanks to easy handling
Reduced labour and crane times, as
- climbing platform and formwork are cycled together in one piece
- formwork can be plumbed and aligned very quickly
- tiltable formwork element makes it easy to set up and strike the formwork
- pre-assembled, work-ready platform units
Lower manpower costs
thanks to fast working routines
This practical system
- saves time by combining several operations into one
- lowers labour costs as the formwork can be set up and struck with no need - avoids time-consuming interim storage
-