Facade formwork
Top 50
DOKA
Facade formwork Top 50 speeds up work on pre-cast facades, both with integrated and set-back CIP columns.
Fast construction progress
using only small quantities of equipment
Facade formwork Top 50
- speeds up work, especially where there are integrated CIP columns
- utilises the pre-cast members as stop-ends
- mostly consists of standard Large-area formwork Top 50 components
Very high safety
thanks to integrable fall protection using scaffold tubes or netting
Safe construction workflow, as
- work can be carried out from the safety of the floor-slab
Highly economical
as no extra working and protection platforms are needed
Delivered to your site ready for use
- following professional pre-assembly by the Doka Ready-to-Use Service
Fast construction progress
using only small quantities of equipment
Facade formwork Top 50
- speeds up work, especially where there are integrated CIP columns
- utilises the pre-cast members as stop-ends
- mostly consists of standard Large-area formwork Top 50 components
Very high safety
thanks to integrable fall protection using scaffold tubes or netting
Safe construction workflow, as
- work can be carried out from the safety of the floor-slab
Highly economical
as no extra working and protection platforms are needed
Delivered to your site ready for use
- following professional pre-assembly by the Doka Ready-to-Use Service
-
zoom








