loading in progress... Please wait

www.emce.com
Selected product 
platform

Diver launch and recovery platform


DLR-1250 diver launch and recovery unit

This system is used for offshore diving applications, the maximum lowering capacity is 90 meters so it can be used for offshore platform diving operations as well. It consists of an A-frame with 2 approved man riding winches and a redundant electrical driven hydraulic power unit. All fits a 20" standard size container; even 2 off DLR-1250 will fit in one 20" container. One winch is used to lift and lower the dive bell, the other for the clump weight; a third optional winch can be used as a utility/tool winch. The function of the clump weight is to keep the dive bell straight and steady under water. In case of an emergency or breakdown of the wet bell winch the clump weight winch will be able to lift the dive bell and clump weight together.

Designed to fulfil with the requirements of Lloyds and meets UK HSE regulations for personnel lifting operations on offshore installations. The winches and A-frame are dedicated for personnel lifting suitable for diving operations and offered with Lloyds Register of Shipping (LRS) Design Appraisal Certificate and full material trace ability. They have passed the EC testing for these applications, i.e., both the winches and their technical files are in compliance with the requirements of the EC Machinery Directives. The DLR-1250 also complies with IMCA regulations and comes with an ATEX certificate as well.

The DLR-1250 is available for sale or lease.


More specifications...

Other products from -

EMCÉ

     Group -

Stokvis Group

 
back

soc-pmea www di En 2009-11-48-28