High frequency vibration motor
Henan winner vibrating equipment CO.,LTD
Product Description:
WLZD series vibrating motors are new type patent products of our company.
Based on the YZO series, WLZD series products are the optimization design with two motors as a whole doing straight motion on the base of YZO series.
WLZD series products have the advantages performance reliably, small volume, convenient maintenance and long life.
Voltage: 380V
Frequency: 50HZ
Insulation class: B
Functioning: continual service
Ambient Temperature: less than 40
Altitude: under 1000 meters
Operation and maintenance
1. The couple vibrating motors are joined as a whole with relative motion.
2. While installing the motor on the vibrating equipments, holding down bolt should use release device in case bolt loosening which can cause vibrating motor damage.
3. Pleases test run the motor for 2-4 hours after installation, then the machine can be used if every thing is fine during test running.
4. Light maintenance should be made once every 4-6 months, and general repair should be done once a year.
5 Maintenance for bearing should be done periodically, by adding lubricant on it properly once every 3-5 months, the amount of lubricant injection could be 2/3 of bearing chamber.
WLZD series vibrating motors are new type patent products of our company.
Based on the YZO series, WLZD series products are the optimization design with two motors as a whole doing straight motion on the base of YZO series.
WLZD series products have the advantages performance reliably, small volume, convenient maintenance and long life.
Voltage: 380V
Frequency: 50HZ
Insulation class: B
Functioning: continual service
Ambient Temperature: less than 40
Altitude: under 1000 meters
Operation and maintenance
1. The couple vibrating motors are joined as a whole with relative motion.
2. While installing the motor on the vibrating equipments, holding down bolt should use release device in case bolt loosening which can cause vibrating motor damage.
3. Pleases test run the motor for 2-4 hours after installation, then the machine can be used if every thing is fine during test running.
4. Light maintenance should be made once every 4-6 months, and general repair should be done once a year.
5 Maintenance for bearing should be done periodically, by adding lubricant on it properly once every 3-5 months, the amount of lubricant injection could be 2/3 of bearing chamber.
