IHI Construction Machinery limited

Telescopic crawler crane
max. 90 t, 10.5 - 30.3 m | NIK900T IHI Construction Machinery limited

Complicated Operations Made Smooth and Simple
Boom extension/contraction and erection can be operated independently
of other movements. Since extension/contraction and erection can be
done simultaneously in a single combined movement, it's easy to
precisely set up the positions of front attachments. Boom erection can be
done using the control lever or left foot pedal so it's possible to combine
with other complicated movements.
Minimal Fatigue Operating Position
Rotating lever is located close to the operator's seat so even long hours
of operating can be done with much less fatigue. The engine throttle can
be controlled using either the rotating grip on the lever or the right foot
pedal so you can freely choose which according to your current task.
Operator's Seat with Wide View In Any Direction
The front side of the operator's cab features curved glass windows from
top to bottom to ensure great visibility in all directions. Also by keeping
the height of the engine room as low as possible, it's able to maintain a
clear view to the rear and to the left of the operator's seat as well.
Comfortable Operator's Cab
The cab has a width of 940 mm, so you can operate in a quiet, spacious
environment. External air intake type air conditioner compatible with
HCFC alternative refrigerants is equipped as standard.
  • zoom



standListOtherProduct www di En 2012-05-22-31