Automatic handling system for heavy material Minox Technology
Both solutions can be integrated in a Multi Intervention Tower®, along with other related equipment such as skidding systems, moonpool systems and personnel access systems. The Multi Intervention Tower® can also be scaled down to provide regular subsea construction services. We can also provide add-on intervention handling systems for existing support structures.
Multi Intervention Tower
Module Handling Tower - Tower, Skid System and Moonpool
Grenland Group designs and builds module handling towers for subsea well-intervention operations.
The design for the equipment is based on safety for personnel and environment, and for simple and efficient handling of different subsea modules. In addition, the equipment gives easy access for inspection, maintenance and replacement of parts.
Main Features:
- Hydraulic power pack is mounted in a standard 20' ISO container with interface connections for hydraulic and power supply outside the container
- All internal power cable, signal cable and piping are included on the equipment
- Arrangement for local or remote control from control cabin
- Time-effective mobilisation/demobilization of winches
- Heave elimination
- Easy vessel interface
More specifications...