PERI

Scaffolding
PERI UP PERI

Predefined scaffold packages for all job site applications

Simple ordering process, fast and safe assembly

On basis of the PERI UP Rosett modular scaffolding, standardized scaffold units are put together. In so doing, the greatest possible flexibility is achieved using only a minimum number of the same components. They can be used for assembling a reinforcement scaffold in just the same way as for the erection of stair towers or a working platform – this saves investment costs.
Each scaffold unit is completely documented with drawings, parts list and proof of stability. In the assembly instructions, the standard erection method is clearly and understandably presented.

The following scaffold units are available:
PERI UP reinforcement scaffold
- erection height up to 10.60 m (5 levels) and a length up to 9.0 m (3 fields)
- system width 72 or 104 cm
- width of contact area 150 or 250 cm
- can be used as working scaffold in Load Classes 1 to 3 (0.75 – 2.00 kN/m²)
- no ballast required in front of formwork or walls
- movable by crane
  • zoom



Exhibitor's categories
standListOtherProduct www di En 2012-02-06-12