This winch is conceived for very large lifting heights in wind energy towers to lift up a tool case or small spare parts into the nacelle. The service man does not have to carry this load up the ladder or risks an overload of the elevator. PLA-180B-V6 is bottom-up attached to the ceiling (see drawing) and is running very fast.