Conveyor bridge
TC 2/2
PRODECO, a.s.
The project "Transfer of TC 2/2 to inner dump' was implemented in 1999 at Sokolovská uhelná a.s. Within the project PRODECO a.s. as a general supplier provided a general overhaul of spreader ZP 6600.17, general overhaul of excavator KU 800.16 and transfer of conveyors at the technological unit TC 2/2 including their general overhaul. The technological part of the project included delivery of a tripper car, cable car and equipment for coal deflection. The construction part consisted in construction of service roads to conveyors, assembly areas for driving units, addition of switch house Lipnice and bridges over coal lines. An important part was an electric delivery comprising 6 and 22 kV lines, transformer station, switch house as well as radio communication between dispatchings and technology control.
-