Speed up deployment time, reduce start-up costs, and increase onsite reliability of the UPS operation by using the Smart Power Test (SPoT) mode before connecting your critical load.
SPoT (Smart Power Test)
SPoT enables the field service engineer (FSE) to test the UPS with full capacity current flow through important components and converters, without using a large system input current and without needing a load bank connected to the system or other system modifications.
• Simple, easy, and safe method to test the UPS at full power
• Can be conducted after service, repair, upgrade, or commissioning of UPS installation to verify system is properly installed
• Reduce risk to load and improve product quality
• Significant cost, time, and power savings