Asphalt plant
40 - 50 m³ | Verticuve
SECMAIR
The productivity of surface dressings teams is linked to the organization set up to manage the supplying of both chips and binder
For the binder, the main problems are :
* The distance of transportation between production plant and road works.
* Numbers and location of road works.
* The just-in Time supplying of binders.
* The temperature of binder when it's supplying to the sprayer
>>> Mechanically, it consists of :
* a tank with a 40 to 50m3 storage capacity
* a temperature maintaining group
* a system for mixing or decanting binder
* a man hole for having an access inside the tank for all the maintenance operations.
* a VERTICANE
>>> The VERTICANE equipment :
* Facilitates all the sprayer filling operations from their upper gangway
* Sorts out drippings problems.Operators safety as well as equipment cleanliness take part in the brand image of road work techniques.
Operators safety as well as equipment cleanliness take part in the brand image of road work techniques. Cleanliness allies to Quality.
For the binder, the main problems are :
* The distance of transportation between production plant and road works.
* Numbers and location of road works.
* The just-in Time supplying of binders.
* The temperature of binder when it's supplying to the sprayer
>>> Mechanically, it consists of :
* a tank with a 40 to 50m3 storage capacity
* a temperature maintaining group
* a system for mixing or decanting binder
* a man hole for having an access inside the tank for all the maintenance operations.
* a VERTICANE
>>> The VERTICANE equipment :
* Facilitates all the sprayer filling operations from their upper gangway
* Sorts out drippings problems.Operators safety as well as equipment cleanliness take part in the brand image of road work techniques.
Operators safety as well as equipment cleanliness take part in the brand image of road work techniques. Cleanliness allies to Quality.
-
zoom