|
Boiler tube beveler WACHSWeld Preparation Pipe/Tube
The Wachs end prep line has been engineered for fast, precision, on-site facing and beveling of light and heavy wall pipe, tube or casing. The machine mandrel and chuck assembly mounts quickly to the pipe I.D. and is completely self-centering. The machine body is inserted on the mandrel shaft and requires minimal axial and radial clearance. One person can set up, operate and prep a 12” (304.8mm) schedule 80 pipe in less than 20 minutes. Advantages like cold cutting and simultaneous land and bevel generation plus counter boring and flange facing capabilities, make the Wachs end prep line ideal for pipe maintenance and construction work. |






