Pig signaller MPL

pig signaller
pig signaller
pig signaller
pig signaller
Add to favorites
Compare this product
 

Description

To support the continued development of offshore facilities in the oil and gas industry, GD Engineering has developed a range of Multiple Pig Launching solutions for both Topside and Subsea applications to enable sequential pig launching operations to be performed remotely, without the need to depressurize the launcher. Where there is a need to carry out pipeline pigging operations on a frequent basis to maintain product flow, the Multiple Pig Launcher (MPL) provides a reliable and cost effective solution. Sequential pig launching is achieved using field proven Pig, Stop and Bypass (PSB) mechanisms, developed by GD Engineering, to provide a reliable system ensuring that individual pigs are positively launched into the pipeline. Generally, the pig launcher capacity is between 5 to 7 conventional pigs and is also capable of launching intelligent pigs. A Local Control Panel (LCP) for topside launchers provides the necessary control logic and status monitoring required to operate the MPL system. Signals from the LCP are relayed to the control room. The LCP allows valve and PSB operations to be performed in local mode (for maintenance) and remotely (for normal pigging operations). A mechanical key interlock system can be integrated into this system to provide fail safe operation of the valves when pig reloading is required. Examples of recent projects include: BP SHAH DENIZ PROJECT This 12 class 1500 Multiple Pig Launching System was installed on the TPG 500 jackup platform in the Caspian Sea.

Catalogs

No catalogs are available for this product.

See all of CELEROS‘s catalogs
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.