The WEINMANN FRAMETEQ M-300 combi wall system is only very slightly larger than a work table, but combines processes for frame work production and the processing of sheathing on a single work station. Elements for timber frame construction that are planked on one side are manufactured in an automated process with just one operator.
Just one operator and one machine are needed to produce the frame work and secure the sheathing
Low space requirements: Manufacturing of 12-m elements in an area measuring just 110 m²
Automatic positioning of stud arrangement and fully automatic attachment and processing of sheathing
Fast assembly on site, as the piggyback NC stopper system ensures dimensionally accurate elements
Customized production with zero machine setup