SELL YOUR PRODUCTS
*mydirectindustry  
English

Construction motor grader GD655-7

construction motor grader
construction motor grader
construction motor grader
construction motor grader
construction motor grader
Add to favorites
Compare this product
 

Characteristics

Applications
for construction

Description

GD655-7 The GD655-7 provides operators with an all new, ergonomic working environment and the new spacious cab allows more room for operators working long days. Operators will appreciate the new low-effort equipment and steering levers, new transmission controls and articulation stop-at-center feature. Collectively, they significantly reduce operator fatigue. Slightly smaller but “right sized” steering wheel provides more visibility and operator room in the cab, convenient for those long, “blade-up and roading” trips New steering lever allows the operator to keep hands on the low-effort, work equipment levers and make small steering adjustments, while operating without needing to turn the steering wheel New multi-position adjustable arm rests and LH/RH consoles have power raise/lower and mechanical fore/aft adjustments to precisely adjust to operator preferences. New, high-capacity, air-suspension seat softens in-cab machine vibrations for operator New stop-at-center articulation feature simplifies operation New operator presence monitoring system alerts the operator if they leave the seat and controls are not locked out properly A powerful 218 HP (163 kW), EPA Tier 4 Final certified, SAA6D107E-3 engine 2-mode, 3-stage Variable Horsepower Control (VHPC) allows the selection of the appropriate mode, economy or power, to match operating parameters to application requirements for optimal fuel savings

Catalogs

GD655-7
GD655-7
18 Pages

Other Komatsu Construction and Mining Equipment products

MOTOR GRADER

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.