The ERT-MODULO range is recommended for large transformers where the width of the container exceeds the European transport gauge (2500 mm). This makes it possible to create very large ERT-MODULOs to equip large electrical transformers of up to 300 T and more than 100 T of dielectric material.
The ERT-MODULO range is also used when on-site civil engineering is complicated or old, or when it is impossible to create a pit. The ERT-MODULO retention tank forms an “above ground” retention pit that replaces the traditional concrete pit, and rests on a flat, smooth, reinforced civil engineering concrete slab. This considerably reduces your structural work costs and the time it takes to bring your substations into compliance:
In just a few hours, you can use a simple concrete slab to create a retention area that complies with 4-in-1 regulations:
Retention: minimum 100% of the volume of the dielectric, sized by our design engineers
Extinguishing: hydrocarbon pool fires with the EXTICOV-CCF single-slope fire suffocating slats cover, which is fitted to all our range of tanks ERT®.
Filtration: thanks to SPI anti hydrocarbons filters for rainwater drainage with PETRO PIT 410 or PETRO PIPE PI616M2
Protection: of operators thanks to the systematic addition of an electro-forged 30×30 anti-slip grating, or an all-welded CUBE grating capable of withstanding 500daN/m² (2 operators + back-up can), but also SANERFALL™ technology guardrails or MODESCA™ stairs or PLATABUND™ access platform.