Processing plant
Opencast mine
Uzbekistan
3x conveyor bridge on crawlers FBR90.1TW
overburden ...

Tenova TAKRAF has been building conveyor bridges since 1924.The mobile conveyor bridges in the German Lignite mines transport the material from the excavators directly crossing the open pit onto the dump site. Special operational conditions ...
Tenova TAKRAF developed and supplied Slope Conveyor Bridges as a mobile link between a Bucket Wheel/Chain Excavator and a shiftable conveyor installed ...
The project "Transfer of TC 2/2 to inner dump' was implemented in 1999 at Sokolovská uhelná a.s. Within the project PRODECO a.s. as a general supplier provided a general overhaul of spreader ZP 6600.17, ...