E-BERK has also designed and manufactured and delivered recently an EPB Micro TBM (E 2301 ASYA Micro TBM) with a diameter of 2300 mm to be used in Rades Cooling Water Transmission Project in Tunisia. Similar to Anadolu, E 2301 Asya micro TBM is also the first machine manufactured in Turkey in this class.
As part of the Rades project, the E 2301 Model Micro Tunneling Machine (MTBM) has been specially designed by E-Berk engineers for use in excavation purposes. It is also equipped with the equipment that will be required during the excavation of MTBM and was completed in approximately 22 weeks.