The rigid Superdeck is the lower-priced version and is ideal for saving time and boosting construction efficiency within a restricted equipment budget.
The fixed projection outside the building is up to 400 cm. Big enough for material delivered on pallets or in containers.
Long pipes and similar loads are no problem.
can be dismantled and folded for transport
rapid and safe mounting using a crane
5 tonne bearing capacity (total weight 7000 kg)
extra-flat access to building floor ensures optimal access for barrows, pallet wagons and forklifts
loading platform with highest level of safety and considered design
The props must be placed at least 1.5 m apart. On request, we can change the position of the front prop. Please give us the precise location for pre-drilling. The rear props cannot be moved.
Eichinger Equipment is in no way responsible for the consequences of incorrect use.
Important note:
When using forklifts, always consider the weight of the forklift itself and do not exceed the loading capacity of 5 tonnes (including material and forklift).