Twin-mast mast climbing work platform GEDA 1500 Z/ZP

twin-mast mast climbing work platform
twin-mast mast climbing work platform
twin-mast mast climbing work platform
twin-mast mast climbing work platform
twin-mast mast climbing work platform
twin-mast mast climbing work platform
twin-mast mast climbing work platform
twin-mast mast climbing work platform
Add to favorites
Compare this product
 

Characteristics

Type
twin-mast

Description

The transport platform GEDA 1500 Z/ZP unites two different machines in one: a hoist for materials with a load bearing capacity of 2000 kg and a transport platform for material and persons. In contrast to ordinary material hoists, for which the transport of people is strictly prohibited, the GEDA 1500 Z/ZP may transport 7 people in addition to goods as soon as it has been switched to the operating mode “transport platform“. Just as for all other GEDA twin mast transport platforms, you can choose between a lot of different transport platforms and as many different types of roofs. The load platforms provide enough space for bulky and heavy building materials. This can help to improve logistics on site. In order to prevent people from falling down, hot-dip galvanized landing level safety gates with mechanically locked sliding doors are installed to all loading and unloading points. Cargo: Persons and material Mast system: GEDA UNI-X-MAST Load capacity (material): 2000 kg Load capacity (persons): 7 Persons Lifting height: 100 m Lifting speed: 12 m/min / 24 m/min Power supply: 2 x 3 kW / 6.1 kW / 400 V / 50 Hz / 32 A

Other GEDA GmbH products

Rack and Pinion Hoist

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.