OverviewAn integrated rock drill and splitter is a hydraulic attachment that mounts on an excavator. It drills holes and splits rock in one continuous operation. Common applications include mining, quarrying, tunnel excavation and urban construction. Key advantages are: no explosives, very low vibration and almost zero noise.
Main benefits- No explosives: eliminates the need for blasting and associated explosives handling.
- Very low vibration: suitable for work near buildings, hospitals and sensitive infrastructure.
- Almost zero noise: minimizes disturbance in urban or noise-restricted areas.
Cost and operational savings- Explosives and permits: removes explosives costs and permit-related delays and fees.
- Labor and cleanup: produces manageable pieces that reduce loader/truck handling and secondary breaking costs.
- Equipment wear: controlled splitting reduces damage from flying debris and lowers wear on other machines.
- Downtime: allows continuous work without the site clearance and safety hold-ups required for blasting.
Typical operation cycle / Output- Positioning: ~1 minute to align the drill head.
- Drilling: ~2–4 minutes to drill the required hole (depends on rock hardness).
- Splitting: ~2–4 minutes to insert the wedge and split the rock.
- Total per hole: commonly less than 10 minutes (site and rock dependent).
City work vs. mine/quarry workFor city construction and tunneling- Priority on vibration control and low noise.
- Prevents ground subsidence and is suitable next to utilities and subway lines.
- Enables extended working hours in urban environments due to low disturbance.
For mines and quarries- Priority on speed and throughput.
- Hydraulic crawler drill provides fast feed rates; splitter enables quick reduction of boulder size for crusher feed.
- Useful where blasting is restricted (near mine entrance or sensitive zones).
Maintenance and service notes- Daily lubrication: inspect and grease drill rod and wedge system regularly to extend service life.
- Hydraulic oil and filters: keep hydraulic oil clean and change filters per schedule.
- Seal inspection: check splitting cylinder seals weekly to prevent pressure loss.
- Remote-control operation improves operator safety and visibility while reducing handling errors.
Technical specifications- Function: Drilling and splitting all-in-one machine
- Matching excavator model: 25T
- Length: 3900 mm
- Width: 1300 mm
- Height: 1000 mm
- Total weight (including air compressor): 3.2 T
- Hole diameter: 43–115 mm
- Hole depth: 1700 mm
- Average drilling speed: 1 m/min
- Impact energy (per strike): 300 J
- Impact pressure: 17.5 MPa
- Impact flow: 80–100 L/min
- Impact power (listed): 18 kW
- Maximum total flow of the system: 300 L/min
- Rated pressure of excavator system: 40 MPa
- Splitting machine: 380
- Rated tension (splitting): 5000 T
- Splitting time: 3 minutes
- Crack width (listed): 44929 mm
- Displacement of air compressor: 8 m³ / 5 bar
- Dust removal system: can be increased (optional/augmentable)
- Operation method: remote control or driving