• Products
  • Catalogs
  • News & Trends
  • Exhibitions

Rail-mounted gantry crane
for shipbuildingsteel

Rail-mounted gantry crane - Henan Kuangshan Crane Co., Ltd. - for shipbuilding / steel
Rail-mounted gantry crane - Henan Kuangshan Crane Co., Ltd. - for shipbuilding / steel
Rail-mounted gantry crane - Henan Kuangshan Crane Co., Ltd. - for shipbuilding / steel - image - 2
Rail-mounted gantry crane - Henan Kuangshan Crane Co., Ltd. - for shipbuilding / steel - image - 3
Rail-mounted gantry crane - Henan Kuangshan Crane Co., Ltd. - for shipbuilding / steel - image - 4
Rail-mounted gantry crane - Henan Kuangshan Crane Co., Ltd. - for shipbuilding / steel - image - 5
Rail-mounted gantry crane - Henan Kuangshan Crane Co., Ltd. - for shipbuilding / steel - image - 6
Add to favorites
Compare this product

Characteristics

Mobility
rail-mounted
Applications
for shipbuilding
Other characteristics
steel
Load

200 t, 250 t, 360 t, 500 t, 1,200 t
(220.5 us ton, 275.6 us ton, 396.8 us ton, 551.2 us ton, 1,322.8 us ton)

Working height

Min.: 6 m
(19'08" )

Max.: 9 m
(29'06" )

Span

Min.: 8 m
(26'02" )

Max.: 35 m
(114'09" )

Description

Lifting speed: 28~76/10~50m Widely used in: Ship manufacture and the dock Double Girder Gantry Crane for Shipbuilding is one kind of gantry crane, it main used to berth assembled hull. This kind of shipbuilding crane have the feature of load and unload, lifting, segmented turning the air. Have the advantage on turning the hull and close operations. the first is through the upward and downward adjustments, the entire segment by car to bear on. Ship gantry crane used in the place of ship manufacture and the dock, its task is to put all the parts required for the manufacture of the ship (ribs, steel, steel, etc.) from the ground transportation to manufacturing place. this transport work must be able to complete the task in a very long journey in transportation quickly. therefore, the number of cranes decided, enough to reach the dock area of the entire foundation, and each crane mutually interfere with each other in principle. 1. Both side of all the steel plate of crane are pretreatment by pretreatment production line, Sand blasting-- Primer spray--Primer drying. Eliminate the innerstress of steel plate, increase the adhesive force of the steel structure. Ensure the appearance and anticorrosion quality. 2. Steel plate cutting adapt whole sets Messer CNC plasma cutting machine from Germany, very fast cutting speed, little deformation, High precision, Deviation could be controlled within 1mm, it insure the raw material at high quality standard and can reach top level in the industry.
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.