Upright concrete skip for loading under the batching plant.
Use
Upright concrete skip for loading under the batching plant.
Bucket shape
Several shapes are available depending on the plant type (see sketches below).
Type of mechanism
TU mechanism
This gate opening mechanism enables a continuous flow of the concrete from the bucket to the formwork. A tilting receptacle prevents cement grout leakage.
Discharge type
Centre.
Gate opening
Lever.
Means of handling
Central fixed bale arm.
Standard equipment
Hose Ø200mm length 1.5m.
When ordering, please send us the document with all the dimensions for the skip in order to validate the model corresponding to your batching plant.
Particularity
For stability matters, this skip must always be placed inside the basket of the batching plant.