Core drilling drilling rig HWX-350Q
explorationgeotechnicalportable

Core drilling drilling rig - HWX-350Q - Shandong Hengwang Group Co., Ltd. - exploration / geotechnical / portable
Core drilling drilling rig - HWX-350Q - Shandong Hengwang Group Co., Ltd. - exploration / geotechnical / portable
Core drilling drilling rig - HWX-350Q - Shandong Hengwang Group Co., Ltd. - exploration / geotechnical / portable - image - 2
Core drilling drilling rig - HWX-350Q - Shandong Hengwang Group Co., Ltd. - exploration / geotechnical / portable - image - 3
Core drilling drilling rig - HWX-350Q - Shandong Hengwang Group Co., Ltd. - exploration / geotechnical / portable - image - 4
Core drilling drilling rig - HWX-350Q - Shandong Hengwang Group Co., Ltd. - exploration / geotechnical / portable - image - 5
Core drilling drilling rig - HWX-350Q - Shandong Hengwang Group Co., Ltd. - exploration / geotechnical / portable - image - 6
Core drilling drilling rig - HWX-350Q - Shandong Hengwang Group Co., Ltd. - exploration / geotechnical / portable - image - 7
Add to favorites
Compare this product
 

Characteristics

Drilling type
core drilling
Function
exploration, geotechnical
Mobility
portable
Drilling unit
rotary
Other characteristics
diesel engine
Sector
construction, industrial
Drilling diameter

Min.: 80 mm
(3 in)

Max.: 320 mm
(13 in)

Drilling depth

Min.: 400 mm
(15.75 in)

Max.: 1,000 mm
(39.37 in)

Machine weight

170 kg
(374.8 lb)

Description

The concrete core sampling machine is characterized by a dual-column structure and screw feeding method, ensuring stability and ease of operation. Equipped with wheels for convenient mobility, it employs high-speed cutting technology and thin-walled diamond drill bits to efficiently drill high-strength reinforced concrete. It ensures precise hole positioning, smooth hole walls, excellent pore quality, high-quality core samples, minimal vibration, and no damage to the building. Product Structure: 1. After the drilling rig is moved to the work site, the moving wheels are swung 180 degrees backward, and the handle is manipulated to lift the wheels away from the road surface. Adjust the four leveling bolts to ensure that the base is properly positioned at the working site, and the base plane is level. 2. Clean the drilling rig's vertical bar and the ball screw of the elevator and adjust the spindle bearing position. 3. Connect the centrifugal water pump to the water source and fill the water tank to ensure that the water pump can supply water properly. 4. Install the drill bit. 5. Follow the gasoline engine's user manual to inspect and adjust various parts of the engine. When everything is in normal condition, start the engine.

VIDEO

Catalogs

No catalogs are available for this product.

See all of Shandong Hengwang Group Co., Ltd.‘s catalogs

Exhibitions

Meet this supplier at the following exhibition(s):

bauma 2025
bauma 2025

7-13 Apr 2025 München (Germany) Hall Messe München exhibition center - Stand C5.102/3(indoor booth)

  • More information
    *Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.