Steel pallet for scaffold frame
Ideal for transporting several frames simultaneously from one construction site to another.
It can be easily forklifted for more comfortable and safer transport.
Capacity: 19 or 40 frames
Steel pallet for scaffold frame
This is used for transporting several frames simultaneously from one construction site to another. It is conveniently forkable for more comfortable and safer transport. It is perfect for keeping the construction site tidy and space-saving because it is stackable. Our scaffolding carriers have two capacities: 19-frame and 40-frame. It is available in a painted version and is compatible with with a scaffolding interaxle spacing of 1050 mm.
Our products are synonymous with quality and safety!
All of our products comply with each of the European Union’s current regulations, both in the production phase and in the mandatory testing phase. Here at Soltec, safety comes first: your safety is ours. Soltec brand, specialising in lifting equipment for more than 30 years.
Upon delivery of the goods, you will receive an instruction manual with all the certifications that attest to the quality and safety of our product.