Mast for pipe of 3 meters long
Equipped with 2 rotation heads for training of the hammer and the casing
Double hydraulic jaws
Training by chain
Control panel
Not soundproof diesel engine
Lubrication suitcase by jack
4 stabilizing jacks
Crawler
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.