Built on the same proven technology as the V112-3.0 MW®, the V126-3.45 MW® IEC IIA/IEC IIB operates on medium-wind sites. Equipped with the industry known structural shell blades, the blades of the V126-3.45 MW® turbine do not weigh more than those of the V112-3.0 MW®.
The 126 m rotor enables greater wind capture, which in turn produces more energy at a reduced cost. The result is exceptional profitability in areas with low wind, and new frontiers for wind energy investment.
The Vestas 4 MW platform sets new standards for onshore wind performance within regimes ranging from very strong wind and typhoon conditions to ultra low wind.
61 Countries
The Vestas 4 MW platform has been installed in 61 countries since 2010.
+88 GW
The performance and versatility of the 4 MW platform has been proven with more than 88 GW installed since 2010.
Options available
High Wind Operation
Power Optimised Mode
Condition Monitoring System
Service Personnel Lift
Vestas Ice Detection
Vestas De-Icing
Low Temperature Operation to -30°C
Fire Suppression
Vestas Shadow Flicker Control System
Vestas Bat Protection System
Nacelle Hatch for Air Inlet
Aviation Lights
Aviation Markings on the Blades
Technical specifications
POWER REGULATION OPERATIONAL DATA
Pitch regulated with variable speed
Cut-in wind speed
3m/s
Cut-out wind speed
22,5m/s
Re cut-in wind speed
20m/s
Wind class
IEC IIIA/IEC IIB
Standard operating temperature range
from -20°C* to +45°C with de-rating above 30°C
SOUND POWER
(Noise modes dependent on site and country)
NACELLE DIMENSIONS
Height for transport
3.4 m
Height installed (incl. CoolerTop®)
6.9 m
Length
12.8 m
Width
4.2 m