Subsystems such as TR modules, power amplifiers and receivers need to go through long-term ground tests or flight tests during the development process. In order to avoid repeated disassembly and protect electronic devices, the company has developed a liquid-cooled composite phase-change cold plate. During ground commissioning or flight test, the liquid cooling system shall be started to meet the requirements of uninterrupted test for a long time; In actual work, high enthalpy phase-change materials play the role of heat storage and temperature control, and control electronic devices below the node temperature.
Product Features
• Liquid cooling for ground commissioning
• Heat storage for actual work
• Integrated forming, welding and sealing technology
• Long-term uninterrupted testing
• Meeting corresponding thermal design requirements
• Space saving and reliable performance