video corpo

Gas turbine 9F.04
for power generationcombined-cyclemulti-stage

Gas turbine - 9F.04 - GE Power - for power generation / combined-cycle / multi-stage
Gas turbine - 9F.04 - GE Power - for power generation / combined-cycle / multi-stage
Gas turbine - 9F.04 - GE Power - for power generation / combined-cycle / multi-stage - image - 2
Gas turbine - 9F.04 - GE Power - for power generation / combined-cycle / multi-stage - image - 3
Gas turbine - 9F.04 - GE Power - for power generation / combined-cycle / multi-stage - image - 4
Gas turbine - 9F.04 - GE Power - for power generation / combined-cycle / multi-stage - image - 5
Gas turbine - 9F.04 - GE Power - for power generation / combined-cycle / multi-stage - image - 6
Gas turbine - 9F.04 - GE Power - for power generation / combined-cycle / multi-stage - image - 7
Gas turbine - 9F.04 - GE Power - for power generation / combined-cycle / multi-stage - image - 8
Gas turbine - 9F.04 - GE Power - for power generation / combined-cycle / multi-stage - image - 9
Gas turbine - 9F.04 - GE Power - for power generation / combined-cycle / multi-stage - image - 10
Add to favorites
Compare this product

Characteristics

Type
gas
Applications
for power generation
Other characteristics
combined-cycle, multi-stage
Rated power kW

288,000 kW, 443,000 kW, 889,000 kW
(391,570.89 hp, 602,312.17 hp, 1,208,703.21 hp)

Description

With over 450 units deployed to more than 40 countries, GE has the largest operating and most experienced OEM F-class fleet in the world. Our 9F gas turbine delivers consistent performance and accommodates a diverse range of fuels, making it great for a variety of combined cycle and CHP applications. Where flexibility meets high performance 9F features and benefits Cost-effective reliability - right when you need it The rugged 9F.04 gas turbine delivers efficiency, flexible operation, and reliability—and the eight-month delivery cycle gets you up and running fast. GE’s 9F turbine three-stage hot gas path The 9F gas turbine features a three-stage hot gas path (HGP), as well as Advanced Gas Path features, and improved materials provide cooling and longer parts durability. Improved operational flexibility The 9F.04 gas turbine is well-suited for combined cycle applications, with high reliability and availability, and offers turndown to 35% of baseload within emissions compliance. The .04 also features faster start times—up to 20 minutes in simple-cycle and 30 minutes in combined-cycle—along with better availability and high fuel flexibility, as well as improved survivability from grid disruptions and load transients.

VIDEO

Catalogs

No catalogs are available for this product.

See all of GE Power‘s catalogs
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.