•Widely used in: Factories, warehouses, etc.
The crane is composed with Girder frame, Crane travel device, and the trolley with lifting and moving device. There are Pave the rail for the trolley move on the main girder. Assemble the moving table on the outside of the two main girder, one side is prepare for the assemble and maintenance the crane move device, another side is prepare for the assemble of the trolley conductor device. There are full field of view Cabin suspend under the main girder, there are joint control desk or single control box packed within the Cabin, assemble the sidelong ladder between the Cabin and moving table, The main girder joint with the two side end carriage which with the joint point in the middle.
Double welding box girder, beam deflection with DIN/FEM standard
Steel Material: Chinese standard Q235B and Q345B
Trolley rail is made of high strength hot rolled flat steel (16 Mn)
Epoxy zinc-rich painting for one bottoms and two sides of 120μm thick, to achieve a long lifespan, beautiful appearance and good luster
The girder and end beam are connected together by high strength bolts to ensure the structure strength and precision of the whole machine
The end beams are equipped with flat wheel or double rim wheels, anti-friction bearings, buffer blocks and derailment preventing end plate
Maintenance walkway is located on one side of the main girder, consisting of flower pattern plate, 1050meters handrail.