The sewage lifting station with larger storage volume of 117 litres
Areas of application: Single- and two-family houses
5-year warranty for specialist tradesmen when registered
at www.hauptsachejung.de/en
Made in Germany
Ready to connect
Submersible
Clamp-type inlet flange
Versatile connection facilities
PE-tank 117 l
Vortex impeller
With mounted swing-type check valve
Smart home compatible
With its performance graduations, the Compli 500 lifting station has been designed for use in detached houses with increased domestic waste-water inlet and for a larger storage capacity. During the design work, special attention was given to easy handling (weight !), space-saving and uncomplicated installation.
The submersible unit is permitted for general use in areas subject to flooding. The control unit has to be fitted in a well ventilated flood-proof room. The PE tanks has freely accessible drains, a cleaning opening at the top and a clamp-type inlet flange for an easy installation.
The inlet height can be variegated according to the feeding pipe:
DN100: 180-205 mm (left), 250-300 mm (center) and 290-340 mm (right), each continuously adjustable; DN150/DN 50: 180 mm (left), 275 mm (center) and 315 mm (right)
For the connection of a DN 100 feeding pipe a reducer DN 150/100 is enclosed. The tank has vertical inlet in DN 150 or DN 100. If not in use, the rear inlet must be closed with the plug set DN 150 (accessory).
The vortex impeller of the pump with 70 mm free passage offers the safety you can rely on.
The Compli sewage lifting station can be integrated into a smart infrastructure.