Truck-mounted crane PK 12502 SH
articulatedfor constructionlifting

Truck-mounted crane - PK 12502 SH - Palfinger - articulated / for construction / lifting
Truck-mounted crane - PK 12502 SH - Palfinger - articulated / for construction / lifting
Truck-mounted crane - PK 12502 SH - Palfinger - articulated / for construction / lifting - image - 2
Truck-mounted crane - PK 12502 SH - Palfinger - articulated / for construction / lifting - image - 3
Truck-mounted crane - PK 12502 SH - Palfinger - articulated / for construction / lifting - image - 4
Truck-mounted crane - PK 12502 SH - Palfinger - articulated / for construction / lifting - image - 5
Truck-mounted crane - PK 12502 SH - Palfinger - articulated / for construction / lifting - image - 6
Truck-mounted crane - PK 12502 SH - Palfinger - articulated / for construction / lifting - image - 7
Add to favorites
Compare this product

Characteristics

Configuration
truck-mounted
Structure
articulated
Operating environment
for construction
Applications
lifting
Number of axles
4-axle
Other characteristics
hydraulic
Load

1,040 kg
(2,292.8 lb)

Working height

9.7 m
(31'09" )

Total weight

1,160 kg
(2,557 lb)

Description

Loads can be moved more precisely due to the standard Soft Stop Maximum precision and safety due to optional AOS High value retention thanks to coating technology More lifting power due to S-HPLS Additional applications with Power Link Plus Increased comfort and safety due to Soft Stop PRODUCT FEATURES The right surface treatment is the foundation for durable and long-lasting surface protection. The components pass through the priming and painting process stages fully automatically. Through this innovative technology for surface coating, PALFINGER creates a quality standard that is usually only found in the automobile industry. HOW IT WORKS 1. The crane components are cleaned of all impurities by means of cut steel shot blasting. 2. The components are degreased, rinsed, activated and coated with zinc phosphating in the individual immersion tanks. 3. After two additional rinsing processes, the surfaces are passivated as well as rinsed with ultra-pure water. 4. The electrostatic cathodic dip painting follows by immersing the crane components completely in the paint. 5. Excess paint is washed off in two additional operations with an ultra-filtration rinse. 6. Afterwards, the paint is cured at a temperature of 115 degrees for 1.5 hours. 7. At the end, the crane components are given a water-soluble, environmentally friendly two-component finish coat of paint by a painting robot.

VIDEO

Catalogs

No catalogs are available for this product.

See all of Palfinger‘s catalogs
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.