OverviewScott washer cabinet press and assembly line for washing-machine housings. Designed for high-throughput production with an 800T press offering a fast cycle time of 4.5 s (no foundation) depending on configuration. Two feeding modes are available: stack or coil. The line integrates an intelligent safety system compliant with CE requirements.
Automatic- Fully automatic press and clinch operations for cabinet assemblies.
- Press line layout: welding press unit plus five presses linked in-line for continuous production.
- Material feed: selectable stack feed or coil feed to suit production needs.
- Clinch process: uses BTM tools and a Scott-designed hydraulic and mechanical clinch mechanism.
Speed- Total equipment length: 44 m.
- Production cycle time for the line: up to 12 seconds (dependent on setup).
- 800T press cycle: approx. 4.5 seconds (no foundation), configuration-dependent.
Safety- Transparent sliding protective doors connected to the machine and interlocked with safety locks; monitored by a safety PLC.
- Other openings protected by light curtains to meet required safety standards.
Stability- Standard, advanced and stable structural design by Scott.
- Automatic tool positioning for consistent setup and changeover.
- Compact press footprint; in standard configuration the presses typically do not require special foundations.
Noise- Typical operating noise level: approximately 80 dBA.
Technical specifications- Commercial name: Washer Cabinet Press and Assembly Line.
- 800T press: reported cycle time 4.5 s (no foundation) — depends on configuration.
- Press line composition: welding press unit plus 5 in-line presses.
- Feeding options: stack feed or coil feed.
- Clinch line: BTM tools; Scott-designed hydraulic and mechanical clinch mechanism.
- Total equipment length: 44 m.
- Production cycle time (line): up to 12 s depending on setup.
- Safety: sliding protective doors with interlocks, safety PLC monitoring, light curtains on openings.
- Noise level: ~80 dBA.
- Press footprint: compact; typically no special foundation required in standard configuration.