|
|
|
|
|
|
The superheated water boilers made by Bono Energia are designed for thermal capacities ranging from 5 to 60MWt, with hot water outlet temperatures up to 260°C and pressures up to 65bar.
CTH boilers offer a reliable solution for applications such as district heating or industrial processes where hot water (under 120°) is used. For this applications an accurate temperature control and a fast thermal response are needed.
Thanks to their multi-tubular and very compact structure, CTH allow an easy installation and an overall thermal efficiency higher than 94%. The wide furnace, water tube screened, helps the thermal exchange and allows to match the most stringent NOx emissions levels. The external walls of the heaters never reach more than 20-30°C above the ambient temperature.
Up to 30MWt, thanks to their innovative design, CTH heaters are delivered in a package solution. Over 30MWt a field erection of the heater is required.
The pressure parts will be delivered in only two sections reducing the local assembly costs.
CTH heaters offer complete accessibility for cleaning and maintenance through proper inspection doors, which allow to fully inspect their interior.
|
|
Type UT-M as flame-tube smoke-tube boiler
with 3-pass technology acc. to the Pressure
Equipment Directive up to an output of
750-19,200 kW for hot water generation.
Type UT-H as single flame-tube smoke-tube
boiler with 3-pass technology up to an output
of 820-18,300 kW for hot water generation.
Type UT-HZ as double flame-tube smoke-tube
boiler with 3-pass technology up to an output
of 13.000-38,000 kW for hot water generation.
|
|
Combination of high technology and superior workmanship.
Long life, compact design, high capacity to size ratio
Suitable for use of Natural Gas, LPG, Light Oil and Heavy Oil as fuel
Special design to minimize the effects of sediments and scaling on waterside
Well-distributed expansion pattern due to balanced heat absorption within the boiler
Also transportable in modular configuration for site assembly, for boiler rooms with narrow passages.
|
|
The PHW range of hot water boilers has been introduced by Byworth for commercial and light industrial hot water applications.
With outputs ranging from 120 to 1200 kW and working pressure up to 5 bar g, the PHW gives high efficiency at a very competitive price.
|
|
Suitable for heating buildings, hotels, hospitals, plants and other facilities.
Has small dimensions and requires small installation area.Provides stable operating conditions in a very short time after the start up.Has high efficiency.Enviromentally friendly.Has pressurized combustion chamber and 3 pass design. If requested, automatic control unit and elements can be installed.
|
|
Model GTF
SMOKE TUBE THREE-PASS BOILER.
HOT WATER OR SUPERHEATED WATER VERSION, MAX 5 bar
General Features
Big combustion chamber
Pre-arrangement to integrate an underfed automatic grate for wood chips and shavings
Tube bundle and combustion chamber inspection doors
Man-hole upper access door in the water zone
Flanged joints
|
|
Controlled circulation, water tube boilers suitable for the production of hot water, and three gas passes.
They are realized both in vertical and horizontal version. They have elevated efficiencies (>91%) and are tested for pressures up to 36 bar and, for there dimensions, can be installed in reduced spaces.
They produce hot water in only five minutes and have minimum heat dispersions towards the atmosphere which guarantees a higher global efficiency in comparison with a traditional fire tube boiler NPR. Capacity from 116 to 10.000 kW.
|
|
Electric heaters
HTT delivers electric heaters type wte and temperature control units type cps for thermal oil and hot water.
Capacity range from 3 up to 3.000 kW.
Temperatures up to +450° C/+842° F.
Also available in explosion-protected design.
|
|
Model UNIBIN S
SUPERHEATED WATER GENERATOR MAX 5 bar,
COMPLETELY WATER FILLED, WITH SEPARATE EXPANSION VESSEL
DESIGN CONCEPT AS FOR "UNIBIN" SERIES
|
|
|
|
|
|
Model UNIBIN
The arrangement of the generator with respect to its position has been given the greatest importance in the design logic:
the left or right combustion chamber and the three different installation levels allow the designer to give attention to the particulars of the manual loading zone, even if today it is prohibited by the Italian norns.
The same inspection gate can be located on the side or on the front of the boiler as is necessary; with the smoke, leaving the generator, has three different solutions:
an underground passage, direct to the ventilator or else a vertical part of the generator and, or request, this can also act as a pre heater for the air thanks to the air space for the cooling of the smoke.
automatic grid with an Archimedes' screw can be combined with the same boiler, for chips or wet sawdust:
cleary, in this case , not only the internal oven must be modified, but also the ash discharge, which can be changed from manual to automatic with a transversal screw conveyor.
The cleaning of the generator is of great importance, not only to guarantee thermal exchange and thus efficiency , but also to keep the maintenance cost to a minimum.
The bundle of convection tubes is subvertical: special fireproofed septa delimit any smoke detours, decreasing easy drags in horizontal route boilers.
|
|
| ... products without technical information |
| |
| ... products without technical information |
| |
|
|