MEVA Schalungs-Systeme

Slab formwork
MevaDec MEVA Schalungs-Systeme

Form any slab with one and the same system: choose integrated or separate forming face

The MevaDec slab formwork system has revolutionised the was slabs - by far the largest are in concrete works - are poured. Most importantly, it covers three different forming methods in one and the same system, enabling the concrete contractor to form any slab without changing parts and without additional inventory.
The system is easily adaptable to

- Building layout and type
- Work flow requirements
- Slab thickness
- Level heights
- Concrete mixture
- Temperature and climate
- Concrete finish

3-day-per-slab cycles proven on the world´s highest building, the Burj Dubai

Since the MEvaDec is entirely crane-independent and is moved by hand, the system is predestined for high-rise and large-area slab works where crane time is limited or not available. The Burj Dubai required minimum inventory and exceptional speed over 154 levels. With 0 re-facing down-times. And early stripping which leaves the backprop/rehosre in place while beams and panels are stripped for use on the next cycle. The MevaDec fared so well that Turner Corporation USA has deteremined the MevaDec method as the preferred way slabs should be formed.
100% wood-free, all-plastic facing alkus
MEVA is the first formwork manufacturer to equip all its formwork systems with the pioneering all-plastic forming face “alkus“. Thus, all MEVA formwork systems produce a consistent high-quality concrete finish.
  • zoom



Exhibitor's categories
standListOtherProduct www di En 2012-02-07-15