- Building - Construction >
- Construction and Mining Equipment >
- Scaffolding
Scaffolding
{{product.productLabel}} {{product.model}}
{{#if product.featureValues}}{{product.productPrice.formattedPrice}} {{#if product.productPrice.priceType === "PRICE_RANGE" }} - {{product.productPrice.formattedPriceMax}} {{/if}}
{{#each product.specData:i}}
{{name}}: {{value}}
{{#i!=(product.specData.length-1)}}
{{/end}}
{{/each}}
{{{product.idpText}}}
{{product.productLabel}} {{product.model}}
{{#if product.featureValues}}{{product.productPrice.formattedPrice}} {{#if product.productPrice.priceType === "PRICE_RANGE" }} - {{product.productPrice.formattedPriceMax}} {{/if}}
{{#each product.specData:i}}
{{name}}: {{value}}
{{#i!=(product.specData.length-1)}}
{{/end}}
{{/each}}
{{{product.idpText}}}

Working height: 3.4 m - 13.2 m
The mobile scaffolding solution for quick and safe erection due to advanced guardrails, two-metre platform spacing and fewer individual parts. •Scaffold width: 0.75 m; scaffold length: 1.80 m. •Safe and quick assembly ...
ZARGES

• Shoring system, climbing scaffolding, stacking tower, individual column • Light-weight components • Only one support up to a height of 6.5m • Highly flexible due to 8 connection points on supports • ...

- Usage as shoring system, stacking tower and slab table - Low weight of individual parts - Time savings during assembly and dismantling thanks to bolt-free connection technology - Safe and simple assembly via integrated access - Tried ...

Triple scaffold tower composition cm. 75. The new rail guarantees safety and quick work. Aluminium toeboards, practical and safe. Crosspieces and railings are easy to mount and unhook thanks to pressure hooks. Workbenches, with ...

Double scaffold tower composition cm. 80. Hooks for quick connection. Bracket for wall anchoring. High resistance wheel (Ø 200) with height regulator and pressure brake.


Working height: 9.85 m
The CROSS range is designed for intensive use and can work in increments of a metre up to 9.85 m. The floor area of the CROSS 180 is 170 x 65 cm, which offers good working comfort. Sturdy and reliable rails The rectangular ...
TUBESCA

... installation in a shaft involves considerable fall risks as it vertical work at height. At present, scaffolding and ladders are used, with scaffolding being a cumbersome and expensive piece of auxiliary ...

Platform for BIG DEPTH shafts for the guides installation phase. It avoids hiring scaffolding in all the entire vertical shaft that interrupts the elevator assembly process because they must be installed and then uninstalled ...

Solar Platform A platform specifically designed to allow safe access up to roof level for solar panels installation, repair and maintenance. The platform incorporates a hoist facility and an opening in the floor of the platform to ...

... In more complex building designs, the consoles allow the vertical axis of the scaffolding to be shifted. By using the platform ledgers, we are able to build scaffolding up to 3 meters wide. The girders ...

The basic elements of the system are the frame and the platform which serve as the basis of the structure. The steel frames are made of 48.3 pipe with a 2.7 mm wall . The steel grade is S235 JRH with a yield point Re min greater than ...

The basic elements of the system are the frame and the platform which serve as the basis of the structure. The platforms are available in sizes from 0.74 m to 3.00 m . The steel frames are made of 48.3 pipe with a 2.7 mm wall . The steel ...

MODULAHO modular manhole suspended platforms are specially designed for limited access. Fully dismountable, these can pass through a Ø 400mm manhole. MODULAHO manhole suspended platforms are recommended when standard equipment cannot ...

Suspended platform with adjustable angle Efficient : the angle platform allows an unlimited height work and a large workspace. Profitable and ideal for 2 days operations or more. Secure: our e.lift hoists suits this type ...

The SCAFFSHORE system permits the creatively easy, fast, flexible and safe assembly of shoring towers. No pipes and fittings required, stability of the system is achieved by the diagonal ledger bracing. Efficient - Multiple propping ...
SCAFFCO

Scaffshore System The SCAFFSHORE system permits the creatively easy, fast, flexible and safe assembly of shoring towers. No pipes and fittings required, stability of the system is achieved by the diagonal ledger bracing. Efficient - ...
SCAFFCO

The SCAFFLOCK system is the most reliable shoring system for slab support, adaptable to any construction project and provide safe solution as an Access system at any height. Efficient Multiple propping head makes it possible to ...
SCAFFCO

Working height: 3 m - 11 m
Packing: Stretch film for inner packing, plywood case for outer packing Size of fiberglass tube: 50.8*3.2mm Width of platform: 1.35m Advantages: 1: Nanotechnology adopted, more stable and durable 2. Main tubes are made of reinforced ...
Suzhou Baofu Electrical&Safety Equipments Co., Ltd.

Working height: 3 m - 11 m
Packing: Stretch film for inner packing, plywood case for outer packing Size of fiberglass tube: 50.8*3.2 Advantages: 1: Nanotechnology adopted, more stable and durable 2. Main tubes are made of reinforced fiberglass, non-conductive, ...
Suzhou Baofu Electrical&Safety Equipments Co., Ltd.

Working height: 3 m - 11 m
1. Made of firm aviation alluminum alloy: Aluminum 6005&6061 2. Size of aluminum tube: 50.8*2.5mm ( OD: 50.8mm, Thickness: 2.5mm ) 3. Platform size: 2*0.75m, larger space makes workers easily and comfortably work 4. Max. Total loading: ...
Suzhou Baofu Electrical&Safety Equipments Co., Ltd.

Working height: 120, 150, 180, 200 cm
SLABFORM is used as carrier scaffolding under slab and beam. It can be used in 3 different ways such as table form, heavy load scaffold and stair tower. TS EN 74-3 certified base and head jacks are used to balance the ...
OZLER FORMWORK AND SCAFFOLDING SYSTEMS

Working height: 120, 150, 180 cm
SLABFORM-LT is used as carrier scaffolding under slab and beam. TS EN 74-3 certified base and head jacks are used to balance the floor and the bottom of the formwork. The SLABFORM-LT can be displaced by transport trolleys ...
OZLER FORMWORK AND SCAFFOLDING SYSTEMS

Working height: 50 cm
H-TOWER / SHORING SCAFFOLDING SYSTEM H-TOWER is used as carrier scaffolding underslab and beam. It can be installée! in a pracbcal way by placing the H panels on the châssis. TS EN 74-3 certifled base ...
OZLER FORMWORK AND SCAFFOLDING SYSTEMS

... steel construction, suitable for use as a floor formwork removal scaffold or work scaffolding. Maximum permissible load of 150 kg/m2 and according to DIN 4420 Scaffolding Regulations.

Working height: 4.1 m - 14 m
... Professional Scaffolding Systems are made up of modules so it can be set to any height and the platform's working height can also be adjusted according to working height. Thanks to the aluminium structure, its assembly ...
CAGSAN LADDERS

Scaffolding The ringlock scaffolding is used for plastering of industrial structures, buildings, glass cladding and maintenance work. Provide enough security by reducing the risk of injury, offered ...

The ringlock scaffolding is used for plastering of industrial structures, buildings, glass cladding and maintenance work. Provide enough security by reducing the risk of injury, offered range is known for its sturdy construction, ...

... require the central transfer of large loads. It can be erected and used either as an individual tower, main beam or birdcage scaffolding. Fast assembly with bolted connections and pre-assembled tower segments up ...
PERI

Working height: 1,250 mm
High strength, lightweight, aluminium shoring system with built in safety and productivity features that maximise efficiency. aster Alshor Plus reduces installation time and labour requirements due to the connections between frames ...
RMD Kwikform

Wherever high weight – even with different loads per leg – has to be supported in confined spaces, ID15®new is in its element. Ranking as one of the world’s most frequently used frame supports, ID15new is fully ...
Hünnebeck GmbH

MEVA offers efficient, intelligent and easy-to-assemble support solutions. All unnecessary parts have been eliminated, so the systems can be built from just a few basic components and frame types. This streamlines storage, handling and ...
MEVA Schalungs-Systeme

MODUL MODUL is the multidirectional scaffolding system to cover the most complicated and irregular geometry, enabling fast installation with top safety. The system is used as multi-layer scaffold, facade scaffold, holding ...
Faresin Building S.p.A.

All the elements that compose the system of DERCONS scaffolding are made in steel of first quality, tube of 42 mm of diameter and welds fit in the tubes, with which it is guaranteed his security and durability.

Working height: 1, 2 m
Allround Layher scaffolding ringlock system: With Allround Scaffolding System, you are making an investment in a perfected and complete system with all the necessary approvals, and hence in rapid, safe, ...

MP multidirectional scaffolding system Characteristics Applications Technical data Pilosio MP Multidirectional scaffolding is a very flexible system with great modularity and high capacity. Great ...
PILOSIO GROUP S.p.A.

Working height: 8 m - 12 m
Span 300 is a lightweight, aluminium high strength system, designed for fast, easy assembly with rung spacing’s of 276mm. The new Z-configuration bracing enables quick, trouble free assembly while providing a very rigid structure. A ...
Instant UpRight

Working height: 7 m
... Modular Scaffolding MEKA 48 is based on a system of vertical pipes with rosettes allowing up to 8 connections where the horizontal and the diagonal pipes connect, and enable different angles to be made every 50 cm. The ...
DACAME, S.L.

Multicrab is a multilevel, multidirectional scaffolding system. It is equipped with the Crab system, comprising a self-locking wedge key which grips a clamp. Once a ledger comes into contact with a clamp, the wedge ...
Your suggestions for improvement:

Scaffolding is a temporary, modular structure used to provide access to elevated portions of a building under construction or repair.
TechnologiesModern scaffolding is made of tubes, boards and fasteners. Though bamboo scaffolding can still be found in Asia, the most common materials used for the tubes are steel, aluminum and composites. The working surfaces, or platforms are wooden boards or steel or aluminum decking. Scaffolding fixed to the ground or to a wall is safer, while mobile scaffolding offers greater positioning flexibility.
How to chooseScaffolding is chosen for its platform dimensions and maximum working height. Other factors include ease of assembly and disassembly and adaptability to sloping ground. The scaffolding should comply with applicable regulations.
Receive updates on this section every two weeks.
Please refer to our Privacy Policy for details on how DirectIndustry processes your personal data.
- Brand list
- Manufacturer account
- Buyer account
- Our services
- Newsletter subscription
- About VirtualExpo Group
Please specify:
Help us improve:
remaining