PERI SKYDECK
The Tested Panelized Slab Formwork System for Slab Thicknesses up to 95 cm
SKYDECK with drophead system
Striking can be carried out after only one day (depending on the slab thickness and strength of concrete). The panels are easier to detach from the concrete, materials handling is accelerated, and the qunatity of materials is reduced.
Less cleaning means shorter shuttering times
This is possible due to the plastic rack, powder coating and the special design. The SKYDECK main beams lie protected under the panels. The panel as well as the main beams have integrated self-draining edges. The edges of the panels are also undercut which keeps cleaning to a minimum.