Wall formwork Logo alu
Light formwork for building sites without crane and supplement to Logo 1
* Fast connection of panels with wedge clamp
* Massive frame profile guarantee of stability and long-live
* Panel 90 x 270 cm = only 60 kg, only 2 ties at panel hight
* Max. concrete pressure 60 kN/m²
* Quick fixing of accessories thanks to multi functional cross sections
* Fully compatible with Logo steel frame
* Multi-purpose panel for corners, columns, stop-ends
Panel widths (cm): 90 / 75 / 60 / 55 / 50 / 45 / 40 / 30
Panel heights (cm): 270 / 135
Frame depth (cm): 12
Plywood: 15 mm thick, 11-ply Finnish birch plywood
Max. concrete pressure: 60 kN/m² according DIN 18218
|
|
The Modular System for Engineering Structures
PERI engineers have created ideal project and connecting method combinations from known tunnel, bridge and construction engineering load combinations, and developed this to form a versatile construction kit. This means load-optimized and geometrically-adapted supporting formwork can be built from a large selection of system components.
VARIOKIT, the engineering construction kit with rentable, standardized components, is the solution for numerous requirements in civil engineering:
- fast
- safe
- cost-effective
In the process, PERI provides technical information for each project e.g. operating instructions and assembly drawings. Static calculations and assembly support are also integral elements such as the constant support given to contractors and help provided with new tasks for current projects. For all construction projects, PERI can provide everything from one source.
|
|
Circular columns
Steel formwork for round and oval columns
* Absolute tight due to the special design of the vertical joint with overlap of the plywood
* Oval columns and semi-circular stop-ends with connecting panels to
* Modular formwork
* Working platform for security during concrete work
* High use rates, no cost for refuse collection
* No reduction of concrete speed for small diameters
Panel heights (cm): 300 / 275 / 150 / 125 / 75
Diameter (cm): 100 / 90 / 80 / 70 / 60 / 50 / 45 / 40 / 30
35 / 25
Plywood: 3 mm steel sheet
Max. concrete pressure: 85 kN/m² according DIN 18218 (Ø 100 cm)
335 kN/m² according DIN 18218 (Ø 25 cm)
|
|
|
|
|
|
Trapezoidal Girder Formwork TTR/TTS with plywood or with steel face (60 kN/m²-80 kN/m² according DIN 18218)
Adjustable circular formwork for sewage plants, tank constructions, adventure baths, towers, stairwells, garage entrances, walls for gardening and landscaping
* Continously adjustable from 2 m to 5 m and from 5 m to infinite
* Only 0.28 to 0.55 holes for ties per m²
* Immediately usable = perfect forming times
* Absolutely round and accurate dimensions
* System solutions for haunches and slope balance
* Compatible with all other PASCHAL systems
Trapezoidal Girder Formwork with plywood:
Panel widths (cm): Segments 125,5 / 110,5; 240 /230 (222);
60 / 57,5; 62,5 / 55,5
Panel heights (cm): 300 / 150 / 75 / 37,5
Frame depth (cm): 40 (straight condition)
Plywood: 18 mm; 21 mm
Max. concrete pressure: 60 kN/m² according DIN 18218
Tolerances of deflection: According DIN 18202, table 3, line 7
Trapezoidal Girder Formwork with steel face:
Panel widths (cm): Segments 240 / 230; 120 / 115; 60 / 57,5
Panel heights (cm): 300 / 150 / 75 / 37,5
Frame depth (cm): 40 (straight condition)
Plywood: Steel sheet
Max. concrete pressure: 80 kN/m² according DIN 18218
|
|
Coffrage CTR 3010
SAFETY All the accessories of safety are integrated into the panel including protection front face. Extensible railing for an optimal safety casing Sheet QUALITY ép. the 5 mm for best finished fast concrete vertical Assembly and of high degree of accuracy. Rigid ROBUSTNESS Framework with vertical stays out of V with 2 levels of spacers One more: its use with concrete car placing. SIMPLICITY Accessories entirely colisables Level of passage ergonomic spacers Only one assembly tool. The RANGE Panels HT 3,00 m Under rise HT 1,50 m Under rise HT 1,00 m Spillplates HT 0,50 m
|
|
|
|
|
|
SVELT is the modular formwork system that allows for the realization of circular-base walls. The walls circumference can be regulated thanks adjustable rods. Once the radius has been set the modules will not deform, thus allowing for an additional level with the same curvature. In this way SVELT can also be used as a climbing formwork. Its versatility also allows for the realization of wall brackets with an “s” shape ovoid base as well as linear wall brackets. With its 6000 kg/m2 capacity, the new SVELT is a much more reliable tool to toughness and stability the two rods and the supporting steel omegas allow lifting and repositioning without neither a change in curvature or deformations. This allows it to be also used as a climbing formwork.
The counter-cast treated multilayer surface with phenolic film can have thicknesses that vary depending on the curvature that is to be applied to SVELT.
Once the casting is done, the system, being composed of modules with a maximum width of 240 cm, can be transported using any kind of truck.
|
|
|
The circular formwork H 20 is the practical choice for smooth, circular walls and radii of any size greater than 3.50 m – universally adaptable.
|
|
RONDA
Circular formwork
When it comes to shuttering curves, RONDA is the No. 1 choice. For RONDA displays a number of unbeatable features for exceptional precision and economy. The RONDA system is based on rugged, ready-to-use elements with an inbuilt spindle system that permits the realization of any desired radius (upward of 2.75 m) with millimeter precision. With two widths available for the inner and outer elements and three panel heights, the system can always be adapted perfectly to the building geometry in question.
|
|
Circular columns are above all required in structural and civil engineering projects.
In skeleton constructions, entrance halls etc. circular columns are a special architectural feature. A second area of application are underground car parks, water basins and bridge piers.
Almost always a perfect concrete finish is required, since finishing works are virtually never carried out on these columns
|
|
Climbing systems
System equipment to use formwork systems as climbing formwork and establish secure workplaces at high levels
* Applicable with all formwork systems
* Climbing brackets can be moved together with formwork as large units
* Climbing platform as foldable platform with little transport volume
Dimensions: Climbing bracket 200 cm rigid / slidable
KBK 180, width 300 cm, depth 180 cm
Max. Load: Max. live load 4,5 kN/m²
|
|
|
The climbing formwork Xclimb 60 can be either crane-lifted or self-climbing and is designed for highly cost-effective, universal use in the wall-construction and façade sector. Integrated safety as offered by the shield function, for example, complements the enormous versatility of this system.
|
|
MGC/MGS - Guided Climbing / Screens
MGC: Climbing Higher, Climbing Safer
MEVA´s Guided Climbing System MGC comprises vertical formwork and safety platforms as a single unit. It remains securely attached to the building structure during building and lifting. Thus, wind velocities do not affect the building process. Assembly is at ground level for improved safety and speed.
The MGC system is designed to meet the highest standards in effi ciency and safety:
for high-rise construction
complementing the proven climbing scaffold MEVA KLK
The Guided Screens System MGS
is the MGC´s twin system for slabs. Highest safety is guaranteed by full side protection, enhanced by several technical advantages:
spacing of brackets is variable
level heights 3,00 m to 4,25 m
secondary platforms attachable to any bracket
integrated access system
MGS is also assembled at ground level: All parts are lifted into the guard rails from below
|
|
CS 240
Climbing scaffold
CS 240 is a modular climbing scaffold system for a variety of building situations. It can be employed both as a suspended scaffold as well as climbing formwork for handling single-face concrete pressures and/or concrete surcharges. The accessory parts such as placing and trailing platforms are identical on both versions.
|
|
* Four different applications with the same bracket:
1. Working scaffold with an overall width of 2.30 m - high load-bearing capacity, only few anchoring points and excellent adaptation to the building structure
2. Working scaffold plus shoe adapter for the fast attachment of the formwork with assembly locks
3. Climbing scaffold with firmly attached, tiltable formwork - can be transported as a unit
4. Climbing formwork on carriage: climbing scaffold and formwork are connected by the carriage and can be lifted and transported as a unit.
|
|
Adjustable columns formwork Grip for excellent forming times and high demands for exposed concrete
* For forming and dismantling only the tensioners on one side have to be opened resp. closed
* Moving with only one crane cycle (folding mechanism)
* Simple fastening of working platforms and adjustable props
* Little transport volume due to foldable wings
Panel heights (cm): 340 / 300 / 150 / 90
Adjustable range: 20-60 cm, in 5 cm steps
Plywood: 21 mm plastic covered birch plywood
Max. concrete pressure: 80 kN/m² according DIN 18218
|
|
|
|
|
|
Post Wings of Mill: A design multi-sections for a multifunction tool.
VERSATILITY
Design of brackets of bolted reinforcement
0.50 m heights to 9.80 m per superposition of the various elements
SAFETY
Stabilization with the wind ensured by stabilizers various heights according to the configurations
QUALITY
No the hole in sheet metal casing for a better quality of the facing
Seal of sealing incorporated in the panel
Option
Articulations between the 2 half-shells, wheels of translation for an handling of the post.
A tool allowing to carry out all sections of the square or rectangular posts to the step of 2.5 cm:
TYPE 700: of 0.10 X 0.10 m with 0.625 X 0.625 m
TYPE 700 and 1075: of 0.10 X 0.475 m with 0.625 X 1.00 m
TYPE 1075: of 0.475 X 0.475 m with 1.00 X 1.00 m
TYPE 875: of 0.175 X 0.175 m with 0.80 X 0.80 m
The formwork post is designed containing 2 principal elements:
1 - Panels casing out of sheet metal ép. 4 mm
2 - Brackets of reinforcement with adjusting device of squaring
Each post consists of 4 panels assembled in two "half-shells" via brackets.
The 2 "half-shells" are assembled between them by screws and nuts with fast step, unlosable.
|
|
TITAN Column Forms
Titan SF100 column clamp system
Säulenformen TITANColumn clamps are assembled with 4 no. bolted corners and 4 no. hinged for ease of striking on a typical 3.0m high
column.
‘L' sheped column shutters are then crane handled and refixed by only 4 no. tie bars.
The individual column arms of 1.0m and 1.37m can be used in isolation as formwork soldiers on stop-end and foundation shutters.
* Large supporting length. i.e. for 5.4m column height only 4 column clamps required.
* Labour costs reduced for each transfer & re-fixing.
* Designated for maximum concrete pressures.
* Universal clamp for all column dimensions.
* No sanding of edges required.
* Available as a complete column formwork system incl. clamps, plumbing props, concreteing chutes, working platforms and lifting hooks.
* Formwork can be stripped diagonally and transferred in two halves
|
|
|
The ideal choice when large numbers of columns with varying cross-sections have to be formed on schedule and economically.
|
|
The column formwork Caro- Falt consists of four identical panels with articulated links which are assembled like a windmill. The CaroFalt can be used with or without triangular strips to form either sharp or smooth edges.
Adjustment of column section
Thanks to the perforated rail it is easy and fast to adapt the column section from 20 cm to 60 cm in increments of 5 cm – square or rectangular.
|
|
Passenger and Material hoists
Since the rack and pinion drive system has been introduced the vertical transportation of man and material has been revolutioned.
|
|
|
|
|
|
The working scaffold LAB 130 meets these demands. It is a practical working and safety scaffold, which is delivered in stacks and ready for use.
The LAB 130 complies with the German DIN standard 4420 and it can be applied up to scaffolding group No. 4 (300 kg/m²).
* The LAB 130 can be used right from the stack: Just fold up the guard-railing, attach the scaffold to the crane, fold down the brackets, lift the scaffold and suspend it.
* The integrated stacking aid and anti-slipping protection guarantee an efficient and safe transport.
* The LAB 130/240 and the compensation platform fit crosswise on every truck. This reduces transport costs. The platform height of approx. 30 cm allows to stack up to 7 platforms.
* Different platform lengths of 340 cm and 240 cm and the versatile, crescent-shaped corner platform allow to adapt to every building shape.
* The compensation platform 240 allows to close gaps up to 2.00 m.
* You can choose between loop suspension, shoe suspension or tube suspension.
* The platform is planked with durable, non-slipping aluminium on a hot-dip galvanized steel frame construction.
* The guard-railings are provided with an integrated protective grille and with easy-to-handle railing extensions (also with protective grille) - to be applied as safety-catch scaffold.
|
|
|
|
|
|
Wood and steel Custom formwork
With its Universal Formwork System Modular/GE and Trapezoidal Girder System, with adjustable radii, PASCHAL has pushed the feasibility limits for system formwork out even further. But even so, there are still certain shapes and surfaces which cannot be produced with any system formwork. For example, whereas smaller fittings and inlays for system formworks or supplementary formwork can be used usually without any problems. To create or add special concrete surfaces on the job site, this is rarely the case and usually not the most economical solution where larger custom formwork is concerned.
Wood and steel Custom formwork
Larger custom formwork of wood or steel needs meticulous preparation. Usually it is planned with modern CAD systems and created with corresponding workload in carpentry businesses or metal fitters, and erected for test purposes as required.
PASCHAL designs and produces custom formwork in the factory and also assumes responsibality for transport. At the job site, the guaranteed precise fitting components are assembled and then ready for use.
|
|
|
|
|
|
TITAN Megashore - The world's leading falsework system
Alu-Schalungsgerüst TITAN
Fast and versatile
Lightweight, yet exceptionally strong
The TITAN support system is recognised as the leading product
in its field by many professionals in
the construction and civil engineering industries.
Comprising two main components; legs and frames, together with a comprehensive range of accessories, the TITAN support system offers one
of the quickest, most effective and versatile means of providing rapid support and access solutions in an enormous variety of situations. The system can be used in both ‘flying table' and erect and dismantle applications and is ideal for multi-storey structures, water reservoirs and soffit situations where mobility and ease of handling are required.
With the majority of components being manufactured from high grade aluminium to patented designs, the TITAN support system possesses an exceptionally high strength to weight ratio which facilitates rapid erection, whilst its excellent corrosion resistance and robust build quality assure long term durability.
The TITAN support system is designed to reduce labour costs, increase site efficiency, improve safety and meet the demands of today's construction and civil engineering techniques.
Key benefits
|
|
Debris Netting
It is made of polyethylene yarn.
Mesh diameter: 1/8”
Shade: 40%, 144g/m²
Burst strength: 138PSI
|
|
Debris Netting
Protects traffic and pedestrians from falling debris, but also considerably reduces rain and wind penetration, whilst allowing air circulation to improve the working environment for construction personnel.
• Construction: light weight high density polyethylene Monofilament
• Fixings: Buttonholes
• Material: High Density Polythene
• Durability: UV Inhibited
• Colour: blue, red, green, Black and White
• Weight: Gms/m2 80g
• Roll width: 2m x 50m or 3m x 50m
This debris netting has standard eyelets to enable easy installation with cable Ties
|
|
FIXATOR® suspended scaffolding on mast
The FIXEO® suspended scaffolding on mast enables to use suspended platforms even when the roof of the building does not allow for any attachment. FIXEO® is an alternative solution to the tubular scaffolding.
Its patented principle provides working comfort (adjustment of the working level by electrical control), safety (built-in anti-sway safety and fall-prevention system).
|
|
The welded scaffold frame is the core of this type of façade scaffold. The frames are assembled on top of each other. They support working platforms as well as access decks, side protection and bracing. The design enables maximal speed to assemble and disassemble the scaffolding. Reference to assembly guides has to be made. Approvals are required to used these scaffolds in Germany.
Various frame scaffolds are continuously available and updated by new inventions.
Façade scaffold plettac SL70/100
Façade scaffold assco quadro 70/100
Facade scaffold plettac connect 70/100
Approvals are available for most of these ALTRAD plettac assco frame system scaffolds.
|
|
BOSTA 70
Whatever the project – modernization, building construction, roofs, walls, painting or façade cladding, outdoors or indoors – with our BOSTA 70 façade scaffold you’re well equipped for the job. Because BOSTA 70 offers the perfect scaffold solution for every task. It is quickly erected and dismantled, absolutely stable and safe all round. BOSTA 70 is by far the best-selling scaffold system of our company and one of the best in its category. Countless contractors, craftsmen and scaffold erectors rely on its dependability and efficiency – day in, day out.
|
|
Integrated system safety
Standard assembly of PERI UP takes place from a safe position through the guardrail in advance. Without the need of any additional components, the guardrail for the next level can be mounted or dismantled by one person from a safe position below. When entering the next level, the erector is protected against falling by this guardrail.
PERI scaffolding thus fulfils all requirements of the EU Directive concerning the minimum safety and health requirements for the use of work equipment by workers at work – attaching a safety harness as demanded in numerous countries is not necessary with PERI UP.
Our customers receive a scaffold system which fully complies with required proof of stability and working safety. The assembly instructions, which have been translated into many languages, contain the results that are clearly represented throughout.
For the European sector, PERI UP fulfils the requirements placed on a scaffold system according to EN 12810 and EN 12811.
|
|
|
|