ST 60 is an innovative scaffolding system outstanding for easy handling and safety.
ST 60 focuses on just six basic parts to allow a high utilization rate. The low weight
of the parts (max. 15 kg each) and ergonomic board transfer ensure quick, safe and effortless work. The modular design enables the construction of shoring towers that can withstand high loads, in three system dimensions.
Work productively
Only five components from top to bottom
Quick and simple assembly, pre-assemble either upright or lying flat
Clever repositioning of decks
Special stacking frame saves storage space and makes loading and unloading easier
Work safely
Intuitive action ensures quick familiarisation with system
Temporary side protection ensures safety
Lightweight components (< 15 kg) mean easy handling
Deck retainers prevent panel uplift
Built-in ladder to safely access the work area
Integrated crane suspensions
Automatic spindle lock