Project descriptionThe Hyundai Motorsport GmbH in Alzenau established new operational premises for sports car development and optimization. KLEUSBERG installed several partition walls of different heights in the development hall to subdivide work areas and make optimal use of the available hall space. The project involved rapid assembly and flexible space separation within the production environment.
Reference details (project data)Building system: KLEUSBERG Systemraum TRENDLINE
Client: Hyundai Motorsport GmbH, Alzenau
Construction time: approx. 1 week
Gross floor area (GF): 0 m²
Execution: 180 running meters of partition walls
Location: 63755 Alzenau
Planning focus: extremely short realization time
Additional features- 180 running meters of hall partition walls installed in only one week
- Flexible space separation for production environment
- Several partition walls of varying heights to subdivide work areas
Technical specifications- Building system: KLEUSBERG Systemraum TRENDLINE
- Total scope: 180 running meters of partition walls
- Construction / assembly time: approx. 1 week
- Gross floor area (GF) indicated: 0 m² (reference information)
- Execution location: 63755 Alzenau
- Design focus: extremely short realization time, optimal integration into existing hall structure