Drawing on numerous standard MEVA product and quality features, the CaroFalt column formwork concept impresses down to the last detail. The system comprises four identical panels that are hinged together like windmill blades to allow rapid deployment. The assembled unit can be rolled to the next work location using clip-on castors or lifted to the next storey by crane in a single operation.
While the alkus all-plastic facings deliver fair-faced concrete quality, the column arises can also be chamfered through the incorporation of triangular fillets. The high fresh concrete load capacity of 100kN/m² allows the rapid completion of high vertical pours.
The system has integrated safety functions as standard for a trouble-free project, including a working platform and integral access ladder with rear protection.
Optimum size range
Rapid performance of high pours for 20 to 60cm column cross-sections
Square or rectangular column cross-sections, adjustable in 5cm increments
Closed hollow frame profile made of steel
Structurally robust, hot-dip galvanised with MEVA finish, making it durable and easy to clean
Easy-to-use CF spanner
The square or rectangular column cross-section can be adjusted in 5cm increments
using the perforated rail
CF spanner allows fast and easy opening and closing of the column formwork, even from the ladder
Simple, time-saving height adjustment
Only one component is needed for rapid, reliable panel connection: the MEVA assembly lock. This allows single-handed fitting and just a few hammer blows suffice to achieve a strong panel connection
For varying pour heights, the column formwork can be easily shortened or extended at the bottom