PLATINUM 100 generates appreciably lower labor and life-cycle costs than traditional formwork systems. It requires up to 30% less ties up to a height of 3.60 m and delivers high occupational safety as well as high quality concrete surfaces.
Work productively
Up to 3.60 m high panels to match increased wall heights
One tie row less is required for pouring heights of up to 3.60 m compared to traditional systems; 30% less ties
High quality concrete finish reduces amount of rework
One-man tie operation saves time and money
100 kN/m² concrete pressure throughout the system for new SCC and liquid concrete types
Neatly aligned tying and joint grid possible, no matter if the panels are used in upright or horizontal positions
Work safely
Connection elements are secured inside panel during transportation
High concrete pressure up to 100 kN/m² for safe and fast concrete placement
Safe pouring with system platform
Aligning wedge clamps are secured in the panel and deliver tight and flush joints
RFID chips on all sides for easy, fast and individual panel identification, also in stacks
PLATINUM 100 is our innovative crane-set formwork system that requires up to 30% less tying points thanks to the one-man tie operation and delivers high quality concrete surfaces. It generates appreciably lower labor and
life-cycle costs than traditional formwork systems.
PRODUCT ADVANTAGES
One-sided tie operation by a single user saves time and money
One tie row less is required for pouring heights of up to 3.6 m than with traditional systems; 30% less ties
Quick pouring without restrictions due to a load capacity of 100 kN/m² throughout the system