The basic fruit jelly production line includes the following components:
MOM-2 Jelly Depositing Machine
OK-1-8 Cooling Conveyor
Electric Cooking Kettles (KPE), 200 L and 250 L capacity
NSH-02 Pumping Station with Heated Pipeline
Silicone Mould Mats on Rigid Frames
Performance Calculation
The line’s production capacity can be calculated using the formula:
P = (3600 / T) × N × M
Where:
T – depositing cycle time (seconds)
N – number of depositing nozzles
M – weight of one deposited item (kg)
P – output capacity (kg/h)
Example 1:
T = 2 sec
N = 8 nozzles
M = 0.012 kg (12 g)
P = (3600 / 2) × 8 × 0.012 = 173 kg/h
Example 2:
T = 2 sec
N = 12 nozzles
M = 0.020 kg (20 g)
P = (3600 / 2) × 12 × 0.020 = 216 kg/h