Product overviewThe VARIOKIT heavy-duty shoring system provides temporary support for heavy concreting loads in bridge construction and specialised industrial applications. Combining PERI VST heavy-duty shoring towers with VRB truss girders enables safe transfer of superstructure loads across very large spans while optimising on-site material usage.
VARIOKIT Heavy-Duty Shoring in action- Efficient: High load-bearing capacity and structural optimisation reduce required on-site material.
- Versatile: Rentable system solutions and customizable VARIOKIT configurations adapt to diverse project requirements.
- Fast and simple: Quick assembly with fitted bolt connections for reduced installation time.
Components- PERI VST heavy-duty shoring towers
- VRB heavy-duty truss girders
- VARIOKIT engineering construction kit (customizable system elements)
Applications- Bridge construction — transfer of concreting loads across very large spans
- Specialised industrial construction requiring temporary heavy-load support
Key features- High load-bearing capacity suitable for large spans
- Structural optimisation to minimise on-site material quantity
- Low dead weight of VRB truss girders for handling efficiency
- Adjustable tower and truss girder heights and lengths to match project parameters
- Fast and simple assembly using fitted bolt connections
- Rentable system solutions and customizable overall VARIOKIT concepts
- Efficient transfer of concreting loads from bridge superstructure
Technical specifications- System type: Heavy-duty shoring system (VARIOKIT)
- Main components: PERI VST heavy-duty shoring towers, VRB truss girders
- Primary use: Transfer of heavy concreting loads across large spans (bridge superstructures, special industrial supports)
- Design advantages: High load-bearing capacity, low dead weight, structural optimisation
- Assembly: Fitted bolt connections for fast and simple assembly
- Adaptability: Adjustable heights and lengths; customizable VARIOKIT configurations
- Availability: Rentable system solutions for variable project needs