The HP 259 is a two stage station with automatic changeover.
It serves the save supply of high purity and mixed gases from 2 single cylinders or cylinder boundles.
The cangeover sets in as soon as the pressure in the first side sinks below a predetermind level.
This process is controlled by two installed pressure regulators which are connected by there outlets.
The station is mounted on a stainless steel panel and has at the standard version a inlet and outlet gauge, as well as a relif valve and a shut off valve for the process and pure gas.
Special characteristics:
Modular design of the cylinder station. Shut-off valves for process and purge gas.
Expandability for 2x2 cylinders / cylinder bundles is already integrated.
Options for external gas purging can be retrofitted without any problem.
Especally for gases with high requirements on purity up to 5.0. Secure and leak-proof where an uninterrupted supply over night and at weekends must be guaranteed.
With options like contact gauges and gas alarm boxes (see segment 7) the supply concept can be optimised further.