When the process starts the process water will be added to the bowl. Sanding dust and workpiece excess material in the process water will continuously return to the sump, via the gap between the bottom disc and the ring. In the sump a submersible pump is mounted, which automatically will pump the water compound to a conical PE tank, where the sludge will fall to the bottom of the cone in the PE tank. The process water to be recycled will be taken out above the middle of the PE tank to ensure using the cleanest process water
Control of the machine’s functions takes place on a 5” colour touch screen. Here, rotation speed and process time are controlled as the most important parameters. All functions that are connected can also be operated manually. It is also possible to choose different languages. The process around the Turbo-Line is prepared with:
• Air-operated diaphragm pump for removal of consumed process water incl. slam
• Connection of water supply
• Bottom drain