Introducing OmniDEKA, the result of intensive development from the ground up to provide a fresh take on how an automatic high-level binlift should be built.
OmniDEKA comes packed with functionality, flexibility and features, all built upon a foundation of years of experience, generations of bin lifts and listening to customer feedback.
Our front line high level automatic split bin lift and combines all of the proven features of previous high level lifts together with a considerable number of innovative new features to give you better efficiency, higher levels of safety and lower cost of operation.
The OmniDEKA offers greater flexibility than ever before to suit a variety of applications, depending on the RCV body variant, mounting heights from 1150mm up to a maximum height of 1675mm are possible.
SPECIFICATIONS
Cycle Time: 2-wheel containers 6-7 sec. 4-wheeled 10-12 sec
Handling Capacity: 170kg (split) / 750kg (linked)
Noise Level: < 61 dB(A)
Mounting Method: DIN Frame
Safety: CE machinery directive certification, EN 1501.1 & EN 1501.5
Operation Mode: Automatic & Manual
Weight: 650 kg
Hydraulic Requirements: ideal 40 l/min., maximum 60 l/min., 180 bar
Auto-Gather: Yes
Diagnostic Display: Yes